All that's left is having the plumber connect the drain and put the valves on and patch the hole. Then I can grout the tile, and hook up the sink, tub and toilet. Then again, the fixtures for the tub, and the whole sink have yet to arrive....
I have some trim tiles too but I'm hoping i can finish that this week.
Maybe by this weekend?
No comments:
Post a Comment